Foxconn Industrial; Mount Pleasant, WI

Installed large diameter Storm sewer including removing & relaying approx. 8,000 LF 36”- 98” RCP Storm for utility conflicts. Install 84” RCP & 98” Elliptical Storm & Structures up to 144” Diameter. Install approx. 12,000 LF 12” – 36” RCP & Structures

Indian Lakes RV Resort; Batesville, IN

Installed sewer, water & storm including 7,200 LF 8” Sewer, 5,600 LF 6” Sewer & 2 Lift Stations up to 24’ depth. Install 9,000 LF 4”- 6” C900 Watermain, 9,100 LF ¾” Services. Install 2,500 LF 12” RCP Storm.

Stone Ridge Subdivision; Lake Geneva, WI

Installed sewer, water, storm lines. Included 22’-0″ depth sewer line.

U-Haul Facility; Lincolnshire, IL

Installed sewer, water to new building and services to an existing building. Installed Storm sewer for 12-acre parking lot. Included 18’ depth lift station.

Yukon Trails RV & Camping Resort; Lyndon Station, WI

Yukon Trails RV & Camping Resort is nestled in and around the Wisconsin Dells area. Surrounded by large pines and massive oaks, it is known for its rustic family-style camping. Wilson Excavating seized the opportunity to install pre-made cabins manufactured by S.I. Container Builds out of Storage containers. Wilson Excavating worked in conjunction with B&C Enterprises to set them on Geopier foundations and weld angles to the cabins to attach large custom decks.

Seasons of Hoffman Estates; Hoffman Estates Illinois

Seasons at Hoffman Estates. This apartment community is in Hoffman Estates on Higgins Rd & Moon Lake Blvd. On this 30-acre lot, Wilson Excavating was responsible for the underground work. Installing 60″ dia. RCP or (Round Reinforced Concrete Pipe) with a 96″ Dia. Manhole.